1 introduction composite slabs consist of profiled steel decking with an in situ reinforced concrete topping.
Corrugated steel decking for concrete.
1 5 composite corrugated metal floor decking floor decking specs our composite floor deck is designed primarily to have concrete poured over it to form for a floor or structure.
It is used to support concrete or insulating membrane of a roof.
The standard gray primer is applied to the underside of the steel deck as compared to both sides for roof deck leaving the top side bare for concrete adhesion.
Use our handy charts to find out the span and gauge of metal floor decking that best suits your particular flooring project.
We carry an impressive selection of floor decking in stock and we can also fabricate a variety of patterns gauges and substrates made specifically for your job.
In order to be certain that your deck is going to be a good space outside for many years to come you ll want to engage the services of a deck building company with experience in custom deck setup.
Composite steel deck is a permanent concrete form and provides positive reinforcement while it eliminates the time and cost of wood forming.
Corrugated metal floor decks are used to build floors with a heavy load bearing capacity.
Corrugated steel decking for concrete when it sees decks our professionals are extremely knowledgeable and beneficial.
It was developed to provide a structurally efficient product for use in roof and floor systems.
Corrugated floor decking for any job.
Floor decking provides unbeatable reinforcement to concrete floors.
The decking not only acts as permanent formwork to the concrete but also provides sufficient shear bond with the concrete so that when the concrete has gained strength the two materials act together compositely.
Concrete is generally poured over composite floor deck panels to form the floor structure.
Composite floor decks have embossments that grip the concrete slab and they are typically reinforced with rebar or wire mesh which creates a strong bond with the concrete floor.
The formation of light rust on the top side of the deck prior to concrete placement is common and does not adversely impact the deck or composite deck slab assembly.