Ask this old house general contractor tom silva helps a homeowner repair sections of his vinyl siding that have holes.
Course strip on siding.
Cellwood vinyl starter strip is a required accessory to start any vinyl siding installation job.
Butt joints in adjacent courses should be spaced apart by at least two stud bays for 16 inch o c.
This should be nailed every 6 inches with it s lower edge running along the chalk line.
How to stagger lap siding for walls longer than 12 feet you ll need to butt additional lengths of siding together.
Most suppliers sell two sizes of starter 2 1 2 in.
The bottom of the starter strip the part the bottom panel hooks on to should be at least 1 in.
Most manufacturers produce a starter strip that secures the bottom course of siding to the sheathing and holds it at the proper angle.
Spend the extra few bucks on the wider stuff and start your siding a bit lower.
Battens are the smaller part that go between the boards.
Snap each length of siding in place so that its bottom lip hooks under the starter strip.
This strip will tip the first piece of siding to the proper angle.
Each course except the last one can be nailed normally.
Constructed of low maintenance durable vinyl.
Modern board and batten siding refers to the old wood siding that had boards and battens to fill the gaps between the boards.
Subscribe to this old house.
The last one that goes between the new work and the old work can be face nailed with hardiplank just nail it off near the edge of the strip above countersink the heads and caulk the nail heads to hide them.
It s best to stagger the joints in each successive course to avoid noticeable patterns.
As shown in the diagram a wooden spacer can be used to provide the proper angle for the first strip.
A strip of wood that seals joints in wooden siding.
Measure and cut to length the first piece of siding and nail it in place photo 7.
What i do is replace them from the bottom up.
Framing or one bay for 24 inch o c.
Backed by ply gem s limited lifetime warranty.
Below the top of the foundation but the lower the vinyl siding is installed the better.
Required accessory for starting a vinyl siding job.
Rip and nail up a 3 8 in.
It protects the sheathing from rain snow and pests.
Remember that these layout lines represent the top of each siding course.
Slide it into the corner and nail it every 16 in.
This video shows how to install a starter strip for vinyl and polymer siding installation.
Thick treated wood starter strip along the bottom of the wall above the foundation.
Staret strip secures the first course of siding to the home.